Cycle Time Formula:
From: | To: |
Machine Cycle Time is the total time required for a machine or group of machines to complete one full cycle of operation and produce one part or set of parts. It's a critical metric in manufacturing and production planning.
The calculator uses the basic cycle time formula:
Where:
Explanation: When multiple machines work in parallel, the total cycle time is simply the time per part multiplied by the number of machines.
Details: Accurate cycle time calculation helps in production planning, capacity analysis, bottleneck identification, and efficiency improvement in manufacturing processes.
Tips: Enter the time taken by one machine to produce one part (in seconds) and the number of identical machines working in parallel. All values must be valid (time > 0, machines ≥1).
Q1: What's the difference between cycle time and takt time?
A: Cycle time is the actual time to complete one cycle, while takt time is the required time to meet customer demand.
Q2: How can I reduce cycle time?
A: Methods include process optimization, reducing setup times, eliminating non-value-added steps, and equipment upgrades.
Q3: Does cycle time include setup time?
A: Typically yes - total cycle time includes both processing time and any setup/changeover time per part.
Q4: What if machines have different cycle times?
A: This calculator assumes identical machines. For different machines, the slowest machine determines the overall cycle time.
Q5: How does cycle time relate to production capacity?
A: Production capacity is inversely proportional to cycle time - shorter cycle times mean higher potential output.